Preliminary Plat
Planning / Land Use Permits
Record Number
PL-PPLAT-22-0001
Decision Issued
Current Fees
$
0
.00
Additional fees may be required
Project Information
Location
10017 Peacock Hill Ave
Parcel
Gig Harbor, WA 98332
0222323134
Created
1/18/2022
Submitted
1/18/2022
Approved
- -
Issued
8/9/2023
Closed
- -
Application Expires
7/26/2028
Notes
44 Notes
Begin Date:
8/2/2023
Type:
General Remarks
Text:
CORRECTED HEARING EXAMINERS DECISION - REFLECTING TWO SCRIVENER'S ERRORS 1. On Page 10, line 18 there is a reference to parking impact fees. I believe this should refer to park impact fees. 2. On page 16, Land Use Special Condition #7 includes the phrase final place when I believe the reference should be final plat.
Attachments:
The Reserve Decision - HEX 07 26 2023 - CORRECTED.pdf
Begin Date:
7/27/2023
Type:
General Remarks
Text:
NOTICE OF DECISION - HEX 07 18 2023
Attachments:
The Reserve Decision - HEX 07 26 2023.pdf
Begin Date:
7/18/2023
Type:
Link to all documents
Text:
Applicant's presentation added as additional exhibit
Attachments:
Exhibit Z1 HEX Presentation.pdf
Begin Date:
7/11/2023
Type:
General Remarks
Text:
STAFF REPORT AND EXHIBITS FOR HEARING EXAMINER HEARING SCHEDULED FOR JULY 18, 2023
Attachments:
Exhibit AA EN-23-0011 The Reserve Access Spacing Variance.pdf
Exhibit CC Sewer Capacity Reservation Certificate.pdf
Exhibit E Grette Associates Technical Memorandum.pdf
Exhibit L NOPM Comment from Rory Doering.pdf
Exhibit T Staff Response to Rory Doering.pdf
Exhibit Q DNS Comment from John McMillan.pdf
Exhibit U Preliminary Drainage Control Plan.pdf
Exhibit P DOE DNS Comment.pdf
Exhibit H SEPA DNS with Engineering Memo.pdf
Exhibit C Arborist Report.pdf
Exhibit D DRB Recommendation.pdf
Exhibit BB Certificate of Water Availability.pdf
Exhibit N NOPM Comment from John McMillan.pdf
Exhibit Y EN-22-0049 The Reserve Typical Minor Arterial Roadway Section Variance.pdf
Exhibit V EN-23-0010 The Reserve Vault Location Variance Package.pdf
Exhibit DD Sewer Hydralic Report.pdf
Exhibit K NOPM Comment from John McMillan.pdf
Exhibit Z EN-22-0050 The Reserve Cul-de-Sac Variance.pdf
Exhhibit A PL-PPLAT-22-0001 The Reserve Preliminary Plat HEX Report.pdf
Exhibit G Geotechnical Report.pdf
Exhibit W EN-22-0014 The Reserve Approach Landing Variance.pdf
Exhibit B Preliminary Plat Plan Set.pdf
Exhibit J Squaxin Island Tribe NOA Comment.pdf
Exhibit M NOPM Comment from Joe Norberg.pdf
Exhibit F Wetland Assessment Technical Memorandum.pdf
Exhibit O NOPM Comment from Tony DeMarco.pdf
Exhibit X EN-22-0015 The Reserve Joint Use Driveway Variance.pdf
Exhibit S DNS Comment from Rory Doering.pdf
Exhibit I DOE NOA Comment.pdf
Exhibit EE NOPH Comment from John McMillan.pdf
Exhibit R Staff Response to John McMillan.pdf
Begin Date:
4/12/2023
Type:
Link to all documents
Text:
Comments received during DNS Comment Period 04.12 -04.27
Attachments:
2023.04.19 McMillan.pdf
Begin Date:
4/12/2023
Type:
General Remarks
Text:
DECLARATION OF MAILING / PUBLISHING DNS TO AGENCIES | NOTICE OF DNS TO P..OWNERS / TNT AND WEB
Attachments:
2016-10-18_ConcRpt_The Reserve Plat.pdf
2016-06-02_The Reserve PPlat SCRC.pdf
PL_PPLAT-22-0001 Certificate of Water Availability-1.pdf
2017-06-13_The Reserve Plat. TCRC.pdf
PL_PPLAT-22-0001_Traffic Rpt 12.7.22-1.pdf
2023.2.21_The Reserve-SEPA.pdf
2023-2-17 The Reserve_Sewer Rpt 01.16.23.pdf
2023-2-2_The Reserve Preliminary_Drainage Control Plan Rpt.pdf
DNS.pdf
Begin Date:
1/27/2023
Type:
General Remarks
Text:
SUBMITTAL DOCUMENTS FOR STAFF'S 4TH PROJECT REVIEW RECEIVED 01 27 2023
Attachments:
PL_PPLAT-22-0001_Sewer Rpt 01.16.23.pdf
PL_PPLAT-22-0001_Maintenance Source Control Manual 01.20.23.pdf
PL_PPLAT-22-0001_vault struct dwg 12-19-2022.pdf
PL_PPLAT-22-0001_Staff Review Comments Response Letter.pdf
PL_PPLAT-22-0001_Preliminary Plat Plan Set 01.25.23.pdf
PL_PPLAT-22-0001_Retaining Wall Design and Calcs 09.09.22..pdf
PL_PPLAT-22-0001_DRAFT Stormwater Maintenance Agreement 01.23.23.pdf
PL_PPLAT-22-0001_SEPA Checklist 12.21.22.pdf
PL_PPLAT-22-0001_vault struct calcs 12-19-2022.pdf
PL_PPLAT-22-0001_Arborist Rpt 09.27.22.pdf
PL_PPLAT-22-0001_Drainage Control Plan Rpt 01.23.23.pdf
PL_PPLAT-22-0001_Revision_Correction_Form.pdf
PL_PPLAT-22-0001_Geotech Rpt 01.12.23.pdf
PL_PPLAT-22-0001_Wetland Rpt 11.7.22.pdf
PL_PPLAT-22-0001_SWPPP 01.24.23.pdf
PL_PPLAT-22-0001_Traffic Rpt 12.7.22.pdf
Begin Date:
11/30/2022
Type:
General Remarks
Text:
Good morning. Staff has completed its third review of THE RESERVE PRELIMINARY PLAT - PL-PPLAT-22-0001 project, I have included below a link to staffs comments for your review. Please review staffs comments and follow up with me once you are ready to resubmit your materials addressing staffs comments, I will send you a File Request link to upload your revised submittal. Please include a detailed narrative that corresponds to each of the comments noted in the summary sheet. Additionally, please include a completed correction/revision form to aid in proper routing of your submittals. Per Gig Harbor Municipal Code 19.02.006.A the applicant shall have 90 days to submit the necessary information or revisions, or request a decision on the application. If the applicant responds in writing and indicates that more than 90 days is required to provide the additional information or revisions, the director may accept a reasonable timeline for submittal of all information requested or revisions. In addition please be aware that staff was unable to pull a summary report for the Revised Geotechnical Report, staffs comments are noted in blue within the report so please review the report to ensure that you have all of staffs comments. Lastly, as this is staffs third review a fee of $800.00 is required prior to staff providing review of the fourth revisions, an invoice will be included for the $800.00 fee once a link has been requested to upload the revisions. Please let me know if you have any questions. REVISION / CORRECTION FORM STAFF REVIEW COMMENTS: Please be advised that this review requests additional materials and/or clarifications needed to complete the review and approval of your project. This letter officially stops the 120-day review timeline for your application per GHMC 19.02.007(B). The clock will be restarted following the submittal of all requested items in this letter, consistent with the provisions of the code. Submittals which only address portions of the materials requested will not re-start the review clock. Submitting Corrections: Please be advised that the City requires that you include a City of Gig Harbor Revision/Correction form with your re-submittal. Please be advised that responding to this letter is considered a correction. A copy of this form is attached to the letter for your use. Copies can also be obtained at the front counter or on-line in a form-fill-able version. Submittals received without the form, may be returned. 90-Day Correction Deadline: Please be advised that the GHMC provides a standard 90-day timeframe for applicants to submit revisions and additional information in response to a review/corrections letter. If materials are not submitted within 90 days, the City may start the process to close your application file for inactivity (See GHMC 19.02.006). If for some reason you anticipate needing additional time to respond to this letter, please advise me of your timeline and when materials can be expected. Correction Fees: Please be advised that if this letter is in response to the third submittal for this project. The Planning Department review fees paid at the time of application include the review of three plans sets (the initial submittal and two revisions) and preparation of documents for approval/hearing. The department charges additional hourly review fees for review of additional submittals after the 3rd review (the 4th submittal). Once you reach the 4th submittal you will be required to submit $800 with the submittal to cover the minimum 8 hour review fee,and will be billed for any additional review hours at a rate of $100/hour.
Attachments:
Sewer Hydraulic Report W. SUMMARY.pdf
Grette Associates Technical Memo 11 22 2022.pdf
The Reserve - Revised Geotechnical Report (1) STAFF COMMENTS NOTED IN RPT.pdf
Drainage Control Plan W. SUMMARY.pdf
DRAFT STORMWATER M.A. W. SUMMARY.pdf
Preliminary Plat Plan Set W. SUMMARY.pdf
Traffic Letter W. SUMMARY.pdf
PL-PPLAT-20-0001 SEPA Checklist W. SUMMARY.pdf
Maintenance and Source Control W. SUMMARY.pdf
Begin Date:
10/24/2022
Type:
Link to all documents
Text:
Critical Area Fees paid
Attachments:
PL-PPLAT-22-0001.pdf
Begin Date:
10/21/2022
Type:
General Remarks
Text:
SCOPE OF WORK AND INVOICE FOR PAYMENT PROVIDED TO APPLICANT 10 21 2022 Good afternoon. Staff has received the Scope of Work from Grette and Associates for THE RESERVE PRELIMINARY PLAT PL-PPLAT-22-0001. Please review the attached Scope of Work and the associated invoice for payment. Once approval has been provided and the fees have been paid staff will then follow up with Grette and Associates and authorize the work to be performed. Please let me know if you have any additional questions.
Attachments:
Request for Fee Payment (2).pdf
Begin Date:
9/29/2022
Type:
General Remarks
Text:
FILE REQUEST LINK SENT FOR REVISIONS TO STAFF'S SECOND REVIEW COMMENTS: Good morning. Thank you for following up with me and requesting an upload link for THE RESERVE PRELIMINARY PLAT - pl-pplat-22-0001 project, please find below a File Request link to upload your revisions addressing staffs second review comments. Please upload your documents separately using standard naming conventions so that the documents can be easily identified for plan review, i.e.: Site Plan, Floor Plan, Narrative etc. Please be sure that the files are standard PDF, flattened and unlocked, so that staff can apply approval stamps and redlines as needed. Additionally, please complete and return with your submittal the Revisions/Correction form included with this email. Please let me know if you have any questions. FILE REQUEST LINK:
Attachments:
Revision Correction Submittal Form.pdf
Begin Date:
8/18/2022
Type:
General Remarks
Text:
STAFF'S SECOND REVIEW COMMENTS EMAILED TO APPLICANT Good morning. Staff has completed its second review of THE RESERVE PRELIMINARY PLAT - pl-pplat-22-0001 project, I have included below a link to staffs comments for your review and additionally a link to all of the documents utilized for staffs second review. Please review staffs comments and follow up with me once you are ready to resubmit your materials addressing staffs comments, I will send you a File Request link to upload your revised submittal. Please include a detailed narrative that corresponds to each of the comments noted in the summary sheet. Additionally, please include a completed correction/revision form to aid in proper routing of your submittals. Per Gig Harbor Municipal Code 19.02.006.A the applicant shall have 90 days to submit the necessary information or revisions, or request a decision on the application. If the applicant responds in writing and indicates that more than 90 days is required to provide the additional information or revisions, the director may accept a reasonable timeline for submittal of all information requested or revisions. REVISION / CORRECTION FORM STAFF REVIEW COMMENTS: ALL REVIEW DOCUMENTS UTILIZED FOR STAFFS SECOND REVIEW Please be advised that this review requests additional materials and/or clarifications needed to complete the review and approval of your project. This letter officially stops the 120-day review timeline for your application per GHMC 19.02.007(B). The clock will be restarted following the submittal of all requested items in this letter, consistent with the provisions of the code. Submittals which only address portions of the materials requested will not re-start the review clock. Submitting Corrections: Please be advised that the City requires that you include a City of Gig Harbor Revision/Correction form with your re-submittal. Please be advised that responding to this letter is considered a correction. A copy of this form is attached to the letter for your use. Copies can also be obtained at the front counter or on-line in a form-fill-able version. Submittals received without the form, may be returned. 90-Day Correction Deadline: Please be advised that the GHMC provides a standard 90-day timeframe for applicants to submit revisions and additional information in response to a review/corrections letter. If materials are not submitted within 90 days, the City may start the process to close your application file for inactivity (See GHMC 19.02.006). If for some reason you anticipate needing additional time to respond to this letter, please advise me of your timeline and when materials can be expected. Correction Fees: Please be advised that if this letter is in response to the third submittal for this project. The Planning Department review fees paid at the time of application include the review of three plans sets (the initial submittal and two revisions) and preparation of documents for approval/hearing. The department charges additional hourly review fees for review of additional submittals after the 3rd review (the 4th submittal). Once you reach the 4th submittal you will be required to submit $800 with the submittal to cover the minimum 8 hour review fee, and will be billed for any additional review hours at a rate of $100/hour.
Attachments:
PL_PPLAT-22-0001 Geotechnical Report with Summary.pdf
PL_PPLAT-22-0001 Preliminary Plat Plan Set wtih Summary.pdf
PL_PPLAT-22-0001 Sewer Hydraulic Report - with Summary.pdf
PL_PPLAT-22-0001 Drainage Control Plan - Drainage Report with Summary.pdf
PL_PPLAT-22-0001 TrafficLetter-2021-R2-Final - with Summary.pdf
PL_PPLAT-22-0001 Traffic Concurrency Application - with Summary.pdf
PL-PPLAT-22-0001_The Reserve_Alternate Landscape Plan Narrative - with Summary.pdf
PL_PPLAT-22-0001 Arborist Report_Reserve_161228 with Summary.pdf
Begin Date:
8/3/2022
Type:
General Remarks
Text:
STAFF REPORT AND EXHIBITS SENT TO APPLICANT Good afternoon. Staff has prepared the Staff Report and exhibits for the RESERVE PRELIMINARY PLAT pl-pplat-22-0001 project, I have included below a link to the documents. I will send out a link to the Zoom meeting the morning of the hearing. Please let me know if you have any questions.
Begin Date:
8/3/2022
Type:
General Remarks
Text:
Good afternoon Members. The board will meet on August 11th 2022 to review the Reserve Preliminary plat project, the site is located off of Peacock Hill , parcel numbers 0222323134 & 3135. I have included for you below a link to the agenda, materials and the most recent set of minutes for your review. Please let me know f you are not able to attend the meeting and also if you have any questions.
Attachments:
STAFF REPORT AND EXHIBITS 08 11 2022.pdf
Begin Date:
7/29/2022
Type:
General Remarks
Text:
DECLARATION OF MAILING NOPM
Attachments:
Certification - TRANSMITTAL OF MAILING - NOPM.pdf
Begin Date:
7/27/2022
Type:
General Remarks
Text:
Comments in Bluebeam
Begin Date:
7/26/2022
Type:
General Remarks
Text:
NOPM BOARD DELIVERED AND READY FOR PICK-UP Good morning. Staff has received the Notice of Public Meeting posting board for THE RESERVE PRELIMINARY PLAT PL-PPLAT-22-0001 project. The board is ready and available for pickup from the Gig Harbor Civic Center, please contact Cindy Andrews at candrews@gigharborwa.gov to make arrangements to pick up the board. Please have the board posted and the associated Declaration of posting returned by end of the day on Thursday August 4, 2022. Please let me know if you have any questions.
Begin Date:
8/4/2022
Type:
General Remarks
Text:
REVISED NOPM Please remove and replace the Notice of Public Meeting for the Reserve Preliminary Plat that was sent to you yesterday with this revised version attached above and publish in the legal notice section of the Thursday August 4th edition of the Tacoma News Tribune.
Attachments:
Notice of Public Meeting.pdf
Begin Date:
7/25/2022
Type:
General Remarks
Text:
AGENDA FORWARDED TO DRB MEMBERS FOR AUGUST 11, 2022 MEETING DATE Good afternoon. Please find attached the agenda for the August 11, 2022 City of Gig Harbor Design Review Board meeting, I will forward to you the staff report including exhibits and a link to the virtual meeting 1 week prior to the scheduled meeting date. Please let me know if you are unable to attend the virtual meeting and if you have any questions.
Attachments:
2022 08 11 DRB Agenda.pdf
Begin Date:
8/4/2022
Type:
General Remarks
Text:
NOPM SENT TO TNT FOR PUBLICATION ON AUGUST 4, 2022 Please publish the attached Notice of Public Meeting for THE RESERVE PRELIMINARY PLAT - PL-PPLAT-22-0001 project in the legal notice section of the Thursday August 4, 2022 edition of the Tacoma News Tribune. Please let me know if you have any questions.
Attachments:
Notice of Public Meeting.pdf
Begin Date:
5/20/2022
Type:
General Remarks
Text:
Staff is requesting updated /revised plan sets for the Reserve Preliminary Plat project. The current plan sets have too many layers and staff is unable to review all of the information. Please let me know when you are ready to send the revised plan sets and I will send you an upload link for submitta
Begin Date:
5/13/2022
Type:
General Remarks
Text:
Follow-up document submitted by the applicant. This document will be added to the most recent resub.
Attachments:
PL-PPLAT-22-0001 Wetland Stormwater Analysis Letter.pdf
Begin Date:
5/10/2022
Type:
General Remarks
Text:
RECEIVED REVISIONS TO STAFF'S FIRST REVEW COMMENTS / STAFF WORKFLOW STEPS UPDATED.
Information Link:
https://cityofgigharbor.box.com/s/iu02vgwde6y8g5k1ycmls3fejfawa4lw
Attachments:
PL_PPLAT-22-0001 Sewer CRC.pdf
PL_PPLAT-22-0001 Signed MPA.pdf
PL_PPLAT-22-0001 Preliminary Plat Plan Set.pdf
PL_PPLAT-20-0001 Project Narrative.pdf
PL_PPLAT-20-0001_Reserve_PPLAT_Response Letter.pdf
PL-PPLAT-20-0001 SEPA Checklist.pdf
PL-PPLAT-22-0001_The Reserve_Design Review Narrative.pdf
PL_PPLAT-22-0001 Certificate of Water Availability.pdf
PL_PPLAT-22-0001 Arborist Report_Reserve_161228.pdf
PL_PPLAT-22-0001 TrafficLetter-2021-R2-Final.pdf
PL_PPLAT-22-0001 Geotechnical Supplemental Letter - Erosion Control.pdf
PL_PPLAT-22-0001 Drainage Control Plan - Drainage Report.pdf
PL_PPLAT-22-0001 Traffic Concurrency Application.pdf
PL-PPLAT-22-0001_The Reserve_Alternate Landscape Plan Narrative.pdf
PL_PPLAT-22-0001 Civil Land Use Checklist.pdf
PL_PPLAT-22-0001 Wetland Assessment Technical Memorandum.pdf
PL_PPLAT-22-0001 Sewer Hydraulic Report.pdf
PL_PPLAT-22-0001 Geotechnical Report.pdf
PL_PPLAT-22-0001 Revision Correction Submittal Form.pdf
PL_PPLAT-22-0001 Wetland Analysis Report.pdf
Begin Date:
5/9/2022
Type:
General Remarks
Text:
UPLOAD LINK SENT FOR REVISIONS TO STAFFS FIRST REVIEW COMMENTS Thank you for following up with me and requesting an upload link for THE RESERVE PRELIMINARY PLAT - PL-PPLAT-22-0001 project, please find below a File Request link to upload your revisions addressing staffs first review comments. Please upload your documents separately using standard naming conventions so that the documents can be easily identified for plan review, i.e.: Site Plan, Floor Plan, Narrative etc. Please be sure that the files are standard PDF, flattened and unlocked, so that staff can apply approval stamps and redlines as needed. Additionally, please complete and return with your submittal the Revisions/Correction form included with this email. Please let me know if you have any questions.
Information Link:
https://cityofgigharbor.box.com/s/iu02vgwde6y8g5k1ycmls3fejfawa4lw
Begin Date:
3/8/2022
Type:
General Remarks
Text:
Staff has completed its first review of THE RESERVE PRELIMINARY PLAT - PL-PPLAT-22-0001 project, I have included below a link to the staffs comments for your review. Please let me know once you have reviewed the comments and are ready to resubmit your materials addressing staffs comments and I will send you a File Request link to upload your revised submittal. Please let me know if you have any additional questions.
Information Link:
https://cityofgigharbor.box.com/s/lagp6yjkju6pfouyxzmvhl8uxqy7knk5
Attachments:
The Reserve_Preliminary Plat Plans_Summary.pdf
Traffic Analysis 1.8.22_Summary-(2).pdf
Civil Land Use Checklist-Added by City_Summary.pdf
Preliminary Sewer Hydraulic Report_Summary.pdf
The Reserve_Preliminary Plat Plans.pdf
LEGAL DESCRIPTION.pdf
2019-01-15_TCRC.pdf
Traffic Analysis 1.8.22.pdf
SEPA Checklist_01.24.22_Summary.pdf
Wetland Analysis Report.pdf
Geotechnical Report.pdf
Variance Request-Joint Use Driveways.pdf
Project Narrative.pdf
Certificate of Water Availability.pdf
Traffic Analysis 1.8.22_Summary-(1).pdf
Sewer CRC.pdf
Preliminary Drainage Control Plan Report.pdf
Traffic Concurrencey Application.pdf
Civil Land Use Checklist-Added by City.pdf
Variance Request-Landing.pdf
Reserve Signed MPA.pdf
Preliminary Sewer Hydraulic Report.pdf
Arborist Report_Reserve_161228.pdf
Arborist Report_Reserve_161228_Summary.pdf
Preliminary Drainage Control Plan Report_Summary.pdf
Geotechnical Supplemental Letter - Erosion Control.pdf
TheReserve-TrafficLetter-2021-R-Final.pdf
2019-01-15_TCRC_Summary.pdf
Project Narrative_Summary.pdf
The Reserve_Preliminary Plat Site Plan.pdf
Traffic Concurrencey Application_Summary.pdf
SEPA Checklist_01.24.22.pdf
TheReserve-TrafficLetter-2021-R-Final_Summary.pdf
Wetland Assessment Technical Memorandum.pdf
Water Availbility Request.pdf
Reserve Signed MPA_Summary.pdf
Intake Request 01.18.2022.pdf
Begin Date:
2/25/2022
Type:
General Remarks
Text:
Documents need to be brought up to current standards. PW will complete the review when documents are updated and resubmitted.
Begin Date:
2/14/2022
Type:
General Remarks
Text:
Per Shelbi Meyers request the applicant has provided the TCRC application and additional items I have attached them above and uploaded them to the original intake folder in box. As a reminder comments are due by February 24, 2022. Please let me know if you have any questions.
Attachments:
TheReserve-TrafficLetter-2021-R-Final.pdf
Traffic Concurrencey Application.pdf
LEGAL DESCRIPTION.pdf
The Reserve_Preliminary Plat Site Plan.pdf
Begin Date:
2/9/2022
Type:
General Remarks
Text:
ENGINEERING COMMENTS ADDRESSING TIA-CRC EMAIL TO APPLICANT Good morning. Engineering staff has requested that comments related to the Traffic Analysis Report be forwarded on ahead of the remaining city staff comments, I have attached the Summary comments from the Traffic Analysis dated 01.08.22 and included below the Engineering Division comments. Staff is hopeful to receive your comments prior to the city review deadline of Feb 24, 2022. Please follow up with Shelbi Meyer at smeyer@gigharborwa.gov if you have any questions. Engineering Division comments: TRANS-CRC WFR: Traffic Analysis Report dated 1.18.2022 needs to be resubmitted with revisions addressed. A TCRC application will need to be submitted with 14 trips reserved (concurrency model purposes). As of Jan. 1, 2022 City TIF rate is $5,582. ($5,582)*(0.94) = $5,247 rate per SFDU When calculating trips, do not round down. (14 SFR)*(0.94) = 13.16 PM trips For concurrency model purposes, 14 trips will be reserved. For Traffic Impact Fee, applicant will be charged by: ($5,247)*(13.16 trips) = $69,050.52 Please see attached CAM for more information on how the TIF fees were calculated.
Attachments:
EN Client Assistance Memo - Transportation Impact Fees.pdf
Traffic Analysis 1.8.22_Summary SHELBI COMMENTS 02 09 2022.pdf
2019-01-15_TCRC.pdf
Begin Date:
2/3/2022
Type:
General Remarks
Text:
DECLARATION OF PUBLICATION NOA - TNT
Attachments:
DECLARATION OF PUBLICATION TNT NOA.pdf
Begin Date:
2/3/2022
Type:
General Remarks
Text:
NOA INCLUDING SEPA TO AGENCIES The City of Gig Harbor has issued an NOA including the SEPA checklist for THE RESERVE PRELIMINARY PLAT - PL-PPLAT-22-0001 project, I have included above the Notice of Application and associated SEPA checklist and below included a link to all of the project information submitted. Please provide your comments no later than February 18, 2022. Please let me know if you have any questions. NOA INCLUDING SEPA: PERMIT PORTAL
Information Link:
https://cityofgigharbor.box.com/s/pcu37qcyctik7eefx5ddta664z7yw0y0
Attachments:
Transmittal Form-THE RESERVE - SEPA AGENCIES(4).pdf
NOA and SEPA.pdf
Begin Date:
1/28/2022
Type:
General Remarks
Text:
TNT CONFIRMATION - CONFIRMED FOR PUBLICATION ON 02 04 2022
Attachments:
TNT PROOF - IPL0058536.pdf
Begin Date:
1/28/2022
Type:
General Remarks
Text:
DPI PROOF - APPROVED FOR PRINTING Thank you the board looks good and can be printed. There is no address assigned to the parcel, the XXX Peacock Hill Ave will be fine as it is stated on the proof. Can I expect delivery by Thursday Feb 3rd?
Attachments:
DPI NOA_PreliminaryPlat_1-28-22_PROOF_V1.pdf
Begin Date:
1/28/2022
Type:
General Remarks
Text:
NOA EMAILED TO TNT: Please publish the attached Notice of Application for The Reserve Preliminary Plat project in the legal notice section of the Friday February 4, 2022 edition of the Tacoma News Tribune. Please let me know if you have any questions.
Begin Date:
1/28/2022
Type:
General Remarks
Text:
APPLICANT INFORMED THAT THE NOA BOARD HAS BEEN ORDERED. Please be aware that a Notice of Application board has been ordered for THE RESERVE PRELIMINARY PLAT- PL-PPLAT-22-0001 project, I anticipate that the board will be ready for pick up and posting by the week of January 31, 2022. I will contact you as soon as the board has been delivered and is ready and available for pick-up. Please make arrangements to have the board picked-up and posted on the site and the associated Declaration of posting returned by end of the day on Friday February 4, 2022. Please let me know if you have any questions
Attachments:
Applicant letter posting instruct NOA TYPE II .pdf
CERTIFICATION OF PUBLIC NOTICE Posting.pdf
Begin Date:
1/28/2022
Type:
General Remarks
Text:
NOA BOARD REQUEST SENT TO DPI Good morning. Please find attached the Notice of Application board template for The Reserve Preliminary Plat project. This project will require 1 white Notice of Application board (24X48) using the City of Gig Harbor NOA board Template and be delivered to the Civic Center by Thursday February 3, 2022. Please follow up with a proof for approval and let me know if you have any questions
Attachments:
NOA - DPI TEMPLATE.docx
Begin Date:
1/27/2022
Type:
General Remarks
Text:
DETERMINATION OF COMPLETE APPLICATION Good morning. Staff has received a complete application submittal including the payment of the fees and has determined THE RESERVE PRELIMINARY PLAT -- PL-PPLAT-22-0001 project to be complete and ready for staff review. The submittal will be routed for staff review and a Notice of Application board will be prepared that will need to be posted on the site. Once the board has been prepared I will contact you and provide directions for pick up and posting of the board on the site. Please let me know if you have any questions.
Attachments:
Determination Complete App.pdf
Begin Date:
1/27/2022
Type:
General Remarks
Text:
PROJECT SUBMITTAL ROUTED TO STAFF: Good morning. Staff has received a complete application submittal for THE RESERVE PRELIMINARY PLAT- PL-PPLAT-22-0001, below is a link to the submittal in Box and a link to the Bluebeam Session. Please provide your comments by February 24, 2022.
Information Link:
https://cityofgigharbor.box.com/s/ijsslxaw16pdfooql701s8l5o3uhbmxw
Attachments:
Preliminary Drainage Control Plan Report.pdf
Variance Request-Landing.pdf
Preliminary Sewer Hydraulic Report.pdf
The Reserve_Preliminary Plat Plans.pdf
Water Availbility Request.pdf
Wetland Analysis Report.pdf
Certificate of Water Availability.pdf
Project Narrative.pdf
Geotechnical Supplemental Letter - Erosion Control.pdf
Traffic Analysis 1.8.22.pdf
Wetland Assessment Technical Memorandum.pdf
Arborist Report_Reserve_161228.pdf
Sewer CRC.pdf
Reserve Signed MPA.pdf
Geotechnical Report.pdf
Intake Request 01.18.2022.pdf
Variance Request-Joint Use Driveways.pdf
SEPA Checklist_01.24.22.pdf
Begin Date:
1/27/2022
Type:
General Remarks
Text:
BLUEBEAM SESSION FOR PROJECT SUBMITTAL RECEIVED 01 26 2022 You have been invited by AndrewsC to join a Bluebeam Studio Session: PL-PPLAT-22-0001 - THE RESERVE PRELIM PLAT- RCVD 01 26 22 Session ID: 109-711-899 Session URL: https://studio.bluebeam.com/join.html?ID=109-711-899
Information Link:
https://studio.bluebeam.com/join.html?ID=109-711-899
Begin Date:
1/26/2022
Type:
General Remarks
Text:
Darton, I neglected to make an adjustment on the fees for the Alternative Landscape Plan fee. Per the Gig Harbor Fee Schedule item B. Land Use Permit Application Fees , items 3 through 14 of the land use fees, when two or more permits are consolidated and processed concurrently, the highest cost land use permit shall be charged the full fee and all other land use permits are charged by 50%. The Alternative Landscape Plan falls under item 5b and is thereby reduced from $630.00 to $315.00. I have attached the updated invoice to reflect the reduction
Attachments:
ViewReport - ALP.pdf
Begin Date:
1/26/2022
Type:
General Remarks
Text:
TECHNICALLY COMPLETE PENDING FEES, INVOICE S SENT Good afternoon. Staff reviewed the submittal for THE RESERVE PRELIMINARY PLAT - PL-PPLAT-22-0001-and have determined the project to be Technically Complete pending fees, I have attached the invoices and included the options for payment for you. Once the fees have been receipted staff will follow up with a Determination of Complete application and the project will be routed for staff review. Please let me know if you have any questions.
Attachments:
ViewReport - PPLAT.pdf
ViewReport - SEPA.pdf
ViewReport - DR.pdf
Request for Fee Payment - The Reserve Prel Plat.pdf
ViewReport - ALP.pdf
Begin Date:
1/26/2022
Type:
General Remarks
Text:
SUBMITTAL DOCUMENTS DATED RECEIVED / TECHNICALLY COMPLETE 01 26 2022
Information Link:
https://cityofgigharbor.box.com/s/ijsslxaw16pdfooql701s8l5o3uhbmxw
Attachments:
Intake Request 01.18.2022.pdf
SEPA Checklist_01.24.22.pdf
Reserve Signed MPA.pdf
Preliminary Drainage Control Plan Report.pdf
Variance Request-Landing.pdf
Variance Request-Joint Use Driveways.pdf
Geotechnical Supplemental Letter - Erosion Control.pdf
Preliminary Sewer Hydraulic Report.pdf
Sewer CRC.pdf
The Reserve_Preliminary Plat Plans.pdf
Wetland Assessment Technical Memorandum.pdf
Wetland Analysis Report.pdf
Geotechnical Report.pdf
Water Availbility Request.pdf
Traffic Analysis 1.8.22.pdf
Arborist Report_Reserve_161228.pdf
Project Narrative.pdf
Certificate of Water Availability.pdf
Begin Date:
1/25/2022
Type:
General Remarks
Text:
DETERMINATION OF INCOMPLETE APPLICATION: Staff has reviewed the intake submittal for the RESERVE PRELIMINARY PLAT -PL-PPLAT-22-0001 and has deemed the submittal Incomplete at this time, I have attached the Determination of Incomplete Application for your review. It will not be necessary at this time to schedule another intake review for the requested information, you can upload the additional information to the link previously sent to you and follow up with me that the information has been uploaded, I will then route it to staff. Please let me know if you have any questions.
Attachments:
Determination Incomplete - The Reserve (2).pdf
Begin Date:
1/25/2022
Type:
General Remarks
Text:
Technically Complete -> Transportation CRC will need to be submitted by applicant if any information has changed since the approval in 2016.
Begin Date:
1/18/2022
Type:
General Remarks
Text:
INTAKE SCHEDULED / FILE REQUEST LINK SENT TO APPLICANT Good morning. Staff has scheduled your intake appointment for Tuesday, January 25, 2022 at 10:00 am for an electronic review of your submittal materials, I have included below a link to upload your documents. Please have all your documents uploaded by 5:00 pm on Monday, January 24, 2022. Please upload documents separately using standard naming conventions so attachments can be easily identified for plan review. For example: Floor Plan, Site Plan, Narrative and Legal, Calcs, etc. Please be sure the files are standard PDF, flattened and unlocked so that approval stamps and redlines can be applied. Once the submittal has been reviewed by staff and deemed Complete An invoice for payment will be sent to you at that time. Please DO NOT attempt to submit payment until after you have received an invoice as staff requires a final review of the invoices to ensure accuracy. Lastly, the intake is viewed electronically by staff, attendance by the applicant is not required. The applicant will be notified once a determination of Complete or Incomplete has been made.
Information Link:
https://cityofgigharbor.box.com/s/ijsslxaw16pdfooql701s8l5o3uhbmxw
Contacts
Contact
Role
PROSPECT DEVELOPMENT
(view notes)
justin@prospectdevelop.com
1-206-276-7526
Submitter of the Application
RESOURCE PROPERTIES LLC
(view notes)
ben@rpdevelopment.com
253-875-0212
Owner of Record
CPH CONSULTANTS
(view notes)
darton@cphconsultants.com
206-909-9659
Project Consultant
Approval Steps
Follow the approval process
Follow your application through the approval process.
Step
Status
Date
Stormwater Review
(view notes)
Approved
2/2/2023
Planning Admin
(view notes)
Approved
7/27/2023
Transportation CRC
(view notes)
Approved
2/8/2023
SEPA
(view notes)
Not Applicable/Not Required
2/15/2023
Engineering Division
(view notes)
Approved
4/10/2023
Senior Engineer
(view notes)
Approved
4/10/2023
Building and Fire Safety Division
(view notes)
Approved
2/1/2023
Legal Description Review
(view notes)
Approved
7/27/2023
Critical Area Review
(view notes)
Approved
2/1/2023
Planning Division
(view notes)
Approved
2/15/2023